Power requirement is 30 kilowatts. Water requirement is 800 to 1,100 gallons per minute.
Water pumps, generators, jigs, and sluice boxes available upon request at an additional cost.
An ideal machine where your raw materials are more of a sandy and gravely type material and not sticky or clay bound. This design allows for nugget and fine gold recovery. The TV5's horizontal design allows for much lower feed height and improved cleaning action of materials. It accepts up to 8-inch material and incorporates three decks for thinning and separation. It has independent spray bars with heavy duty, changeable, brass spray nozzles. All wear areas have replaceable bolt-in wear plates, oversized diameter shafts, oversized bearings, and a high tensile frame.
Testing in clean river bottom material, the wash plant was able to achieve 109 tons per hour with 1,260 gallons per minute of water usage. Under correct conditions, we rate this machine between 50 to 115 tons per hour.
Average typical sluice setup recommended is two 30-inch wide by 30 foot long setup. MSI will calculate this for you to best fit your mine site.
Features include: